AutoCAD
Expert civil site Inspector with 10+ years of experience in the industry and i have Strong drive to succeed with an exceptional aptitude for identifying risks and developing solutions. Also i have the ability to work by myself alone or with a teamwork by using my skills on leadership include being detail-oriented and managing time wisely without losing time. Moreover,I have experience on NOC (No Objection Certificate),AutoCAD and GIS ArcMAP and managing / monitoring projects as a project engineer. I do Coaching for the graduates.
• Technical Support Department | Design Team for The New Projects (Sewerage Network - Vacuum & Gravity System)
• Managing the Construction Projects
• Haya Water New Projects - Design
• Follow up Al Amerat STP, APS1 , APS2 , Wet Connection , B7R Royal Properties Project (Irrigation & Sewerage) and C13 & C3 Tender Design
• Monitoring project progress and it elements such as budget, VOWD, scope, schedule ,resources and tasks to be completed.
• Control the quality be following the methods of statements and specifications
• HSE
• Handing Over and closing Snags
• Communicate with other departments
• Responsible for developing tender document and project design including the scope of work, Terms of Reference (TOR), bill of quantities with the requirements of project charters.
• Providing technical support for review/comment on design documents & drawings to affirm the compliance to the contract requirements.
• Review all technical Submittals / queries from catchments, method of statement, MAS submittals & change requests etc. and ensure timely respond to concerned party.
• In house design & supervision as required.
• Responsible for preparation of all weekly /monthly status reports, co-ordination of training of interns.
• Sewerage Network & TE Supervision
• Asphalts
• Structures
• Test reports | Materials - ITP
• Monitoring the progress of the project
• HSE
• Preparation the Handing Over of projects
• Following the Auditing Compliance
• Distributing the work tasks to the site engineers and following them as a focal point
• Preparing the official letters to the contractors and clients
• As-Built & Shop Drawings Verification
• Closing the Snags list
• Preparing site visits for all concern project parties
• Monitoring the SME's for the Wet Connection projects
• Solving Technical issues on the site
• Solving Customers Complain
• Finalize Technical | Management Issues for the A1 Al Amerat Project
• Coaching The Graduates
Managing projects
undefinedCert Prep: PRINCE2® Foundation and Practitioner
AutoCAD
ArcGIS
Reading
Write Poem
Hiking
Playing Football