Abdullah AL Abri

Chief Engineer

Summary

To grow in the organization with the objective of achieving the organization goal and vision. Strength Determination, Confidence, Honesty, Hard Working, Coordination among cross functional divisions, spontaneous involvement in Team work, Conflict Resolution, Time Management, Leadership and Strong background in mechanical.

Overview

15
15
years of professional experience
5
5
years of post-secondary education

Work History

Project Engineer

Design Department / Public Authority for Electricity and Water
Muscat
04.2008 - 04.2014
  • Liaised with company executives and project managers to acquire resources to move projects forward.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Communicated with industrial equipment installers to deliver technical support throughout project execution.
  • Maintained records for each project and engineering discipline.
  • Determined and scheduled priorities as required to progress engineering work.
  • Planned and managed engineering projects and continuous improvement programs to reduce labor and costs.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Identified technical risks within managed projects.
  • Reviewed progress controls for project quality assurance.
  • Recommended improvements for design, construction means and materials based on field or changing conditions.
  • Delivered concise instructions to technical team to maintain quality control.
  • Evaluated change order requests in response to out-of-scope work activities.
  • Monitored metrics during project execution to maintain compliance with planned costs.
  • Recommended process improvements to reduce unnecessary waste.
  • Analyzed system development efforts using potential ROI and associated liability figures.
  • Assessed impact of modification requests for ongoing projects.
  • Assisted with cost proposal development and customer presentations.
  • Performed constructability reviews of construction bid documents for coordination purposes.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.
  • Trained junior engineers in workstation design and material handling.
  • Provided technical direction of system development methodologies to improve technical performance.
  • Delivered regular compliance reports to drive process improvement and corrective measures.

Senior Projects Engineer

Public Authority for Electricity and water
Muscat
04.2014 - 06.2021
  • Carried out day-to-day duties accurately and efficiently.
  • Identified issues, analyzed information and provided solutions to problems.
  • Worked with customers to understand needs and provide excellent service.
  • Proved successful working within tight deadlines and fast-paced atmosphere.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Participated in team-building activities to enhance working relationships.
  • Developed and maintained courteous and effective working relationships.
  • Exceeded goals through effective task prioritization and great work ethic.
  • Used Microsoft Word and other software tools to create documents and other communications.
  • Maintained energy and enthusiasm in fast-paced environment.
  • Developed team communications and information for meetings.
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
  • Actively listened to customers' requests, confirming full understanding before addressing concerns.
  • Worked to maintain outstanding attendance record, consistently arriving to work ready to start immediately.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Conducted research, gathered information from multiple sources and presented results.
  • Managed team of employees, overseeing hiring, training and professional growth of employees.
  • Received and processed stock into inventory management system.
  • Drove operational improvements which resulted in savings and improved profit margins.
  • Saved $[Amount] by implementing cost-saving initiatives that addressed long-standing problems.

Chief Project Engineers

OWWSC
Muscat + Batinah
06.2021 - Current
  • I participated in the most of the project done by design department
  • Important projects handled: -
  • Expansion of water distribution networks in Muscat Governorate
  • Include ( Bousher, Al
  • Aamerat, Seeb and Muscat wilayat)
  • Water supply to tourist area Baral Al Jissa, Yety & Al Hessen
  • Improvement of transmission in Muscat governorate
  • Wadi Dayqah Dam Treatment Plant
  • Water supply to Muscat & Quriyat from Wadi Dayqah Dam
  • Emergency Water Storage Reservoirs in Muscat
  • Construction of Water Transmission line from Ghoubra to Muscat
  • Rehabilitation of Transimssion line from Wadi Adai to Al Amarat
  • Expansion of water Transmission line in Al Amerat (Hospital)
  • Consultancy Services for Construction Supervision in Muscat
  • New Ghubra PS
  • Construction of RO plant in Uwaifiah
  • Construction of RO plant in Bukha
  • Khasab RO Plant
  • Package small RO Plants for various Islands in Musandum
  • Water supply system to Masirah resort
  • Expansion of Desalination plant in Al Lakbi
  • Construction of RO plant in Marate
  • Construction of RO plant in Al Kahel
  • Water supply system to Soqrah & al Kahel, Wilayat Al Jazer
  • Water supply system to Al Hijj, Wilayat Mahout
  • Construction of RO plant in Al Sail
  • Expansion of Desalination plant in Hitam
  • Expansion of Desalination plant in Hijj
  • Execution Department: I participated in supervision of many project done
  • Identified issues, analyzed information and provided solutions to problems.
  • Worked with customers to understand needs and provide excellent service.
  • Proved successful working within tight deadlines and fast-paced atmosphere.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Improved operations through consistent hard work and dedication.
  • Participated in continuous improvement by generating suggestions, engaging in problem-solving activities to support teamwork.
  • Increased customer satisfaction by resolving issues.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Used Microsoft Word and other software tools to create documents and other communications.
  • Maintained energy and enthusiasm in fast-paced environment.
  • Developed team communications and information for meetings.
  • Prepared variety of different written communications, reports and documents.
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
  • Worked to maintain outstanding attendance record, consistently arriving to work ready to start immediately.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Delivered services to customer locations within specific timeframes.
  • Devoted special emphasis to punctuality and worked to maintain outstanding attendance record.
  • Successfully maintained clean, valid driver's license and access to reliable transportation.
  • Saved $[Amount] by implementing cost-saving initiatives that addressed long-standing problems.
  • Resolved conflicts and negotiated mutually beneficial agreements between parties.

Education

Bachelor of Mechanical Engineering - undefined

Sultan Qaboos University, Sheikh Majid bin Khamis Secondary School
01.2002 - 01.2007

Skills

Project lifecycles

undefined

Accomplishments

  • By design department
  • Important projects handled:
  • 5 MIGD Al Gubrah Mobile SWRO Desalination Plant (completed 2010)
  • Chlorination unit at Al Khoud Reservoir (completed 2011)
  • Expansions of upper Bowsher Reservoir & Associated facilities (completed 2011)
  • Expansions of Mawaleh & Associated facilities (completed 2011)
  • Mawalleh Boundary Wall (completed 2011)
  • Construction of Stores- I & II (completed 2012)
  • Water supply system to Hadif and Al Fay, Al Wajaja (completed 2012)
  • Upgrading of Barka Pump Station (completed 2013)
  • Expansion of water distribution Networks in Seeb package (1) (completed)
  • Expansion of Water Distribution Networks in Seeb Package (2) (completed)
  • Construction of Water Transmission line from Ghoubra to Muscat (completed)
  • Revision of study & design network, Rustaq (ph
  • 1) (ongoing)
  • Water Transmission pipeline from Treatment plant of Wadi Dayqah Dam at
  • Mazari in Wilayat Qurayyat to Deem Reservoir in Muscat, Project Management Professional (PMP)B2
  • Value Engineering Training Workshop (Module 1)
  • Muscat
  • WaterCAD/GEMS V8i; Water Distribution Design and Modeling, Full
  • Muscat
  • Analysis and Design of Water Distribution Networks
  • Leadership Course
  • IDA World Congress 2009 on Desalination and Water Reuse, Dubai
  • Defensive Driving Training on Blacktop & Graded Road (Light Vehicle)
  • Administration of Construction Works Based on Oman's Unified Contract
  • Concrete Durability
  • Foundation Course on Project Management using MSP
  • Design of Reinforced Concrete Structure
  • First International Conference on Indian Ocean Tropical Cyclones & Climate Change
  • SQU
  • Working Safely
  • (iosh Passport)

Timeline

Chief Project Engineers

OWWSC
06.2021 - Current

Senior Projects Engineer

Public Authority for Electricity and water
04.2014 - 06.2021

Project Engineer

Design Department / Public Authority for Electricity and Water
04.2008 - 04.2014

Bachelor of Mechanical Engineering - undefined

Sultan Qaboos University, Sheikh Majid bin Khamis Secondary School
01.2002 - 01.2007
Abdullah AL AbriChief Engineer