Summary
Overview
Work History
Education
Skills
Timeline
Generic
Pravin  Nigam

Pravin Nigam

Muscat

Summary

  • Strong work ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills. MEP, Electromechanical field and Fire Alarms Systems exposure of more than twenty years experience in Telecom Major BSNL India at various senior Class II officer positions working under pressure and adapting to new situations and challenges to best enhance the organizational brand. Hardworking and reliable Electrical Engineer with strong ability in execution of time oriented and quality works, Highly organized, proactive and punctual with team-oriented mentality.

Overview

28
28
years of professional experience

Work History

MEP Project Manager

METCO LLC, OMAN
Muscat
01.2024 - Current
  • Developed and implemented project plans, objectives, budgets and timelines.
  • Managed the design process to ensure conformance with applicable codes, standards and regulations.
  • Reviewed MEP documents for accuracy and completeness of information.
  • Coordinated with other disciplines to ensure a complete set of drawings is available prior to construction.
  • Provided technical guidance to contractors in order to resolve discrepancies between contract documents, field conditions and shop drawing submittals.
  • Conducted regular site visits to monitor progress of work against schedule requirements.
  • Negotiated changes in scope of work with contractors as required by owner's needs or unforeseen field conditions.
  • Managed multiple projects simultaneously while adhering to tight deadlines.
  • Coordinated meetings with clients, subcontractors and vendors as necessary throughout the duration of projects.
  • Prepared monthly progress reports detailing accomplishments, issues encountered and corrective actions taken.
  • Assisted in establishing project goals, objectives, milestones and deliverables.
  • Prepared and planned worksites to help jobs run smoothly.
  • Delegated work to staff, setting priorities and goals.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Recruited and hired workers, in addition to supervising and monitoring daily performance.

Deputy General Manager Electrical , E-5 Scale, PSU

BSNL
BHUJ
10.1999 - 06.2023
  • Design, Estimation, e-Tendering, and key role in Finalizing Bids for all EMS works, including 11/22 kv substation, Electrical MV/LV Panel & Cabling Works, and Microprocessor-based HVAC works.
  • Coordinating all electro-mechanical activities related to telecom installation, including captive plant design (DG SETS) installations, testing, and maintenance schedules.
  • MEP-related rich expertise with almost more than 20 years of experience in Electrical Power and Lighting Solutions, Fire Alarms, Energy Management, Plumbing, Heating, Ventilating, Air Conditioning, and general Piping systems.
  • Drafted wiring diagrams for complex network configurations of automatic fire alarm systems, smoke detectors, and sprinklers.
  • Successfully executing and commissioning the work in schedule time frame, working in tandem with vendor and other government agencies.
  • Design and Installations of complete Electrical Installations of Building from MV panel to Distribution Boards, all type of Earthing protections.
  • ALPS-based Lightning Protection Systems of Buildings from Lightning Strike Damage Prevention & Associated Chemical Earthing Works.
  • Fire Hydrant Systems (water pressure) Installations Testing, getting license, and troubleshooting works.
  • Heat Load-based capacity calculations, design, estimation, e-Tendering, and finalization of successful bids for the microprocessor-based package-type HVAC units, 7/9 TRs.
  • Provided technical support to project teams in the development of new product designs.
  • Created detailed reports on test results and findings from experiments conducted.
  • Assisted in the installation of electrical components during field tests or commissioning activities.
  • Evaluated existing electrical systems for safety issues, potential upgrades, and improvements.
  • Extensive experience in operating and testing mechanical and electromechanical equipment.
  • Coordinated with vendors regarding supply chain management issues related to materials needed for projects.
  • Trained junior engineers on best practices when designing electrical components.
  • Ensured that all installations were compliant with local regulations regarding safety standards.
  • Established project schedules and regular maintenance of project schedules.
  • Performed calculations, panel sizing, selection and lighting control.
  • Provided troubleshooting and analysis for discovered electrical faults, offering potential solutions.
  • Determined appropriate cables, fuses, and electrical elements to use during the installation phase.
  • Utilized and interpreted technical drawings when repairing and installing electrical systems.

Manufacturing Team Member

GE Plastics India
Vadodara
10.1996 - 09.1999
  • Prepared documents such as production reports, time sheets, material orders.
  • Performed or supervised repairs on machines as needed using hand tools or power tools.
  • Operated in compliance with company policies, safety guidelines and EHS requirements.
  • Looked through work orders to determine type and quantity of materials needed for each production batch.
  • Maintained records of preventive maintenance activities.
  • Troubleshot issues related to electrical systems including wiring and circuitry.
  • Diagnosed mechanical problems using technical manuals and schematics.
  • Worked closely with other departments to coordinate repairs or installations of new machinery.

Education

Bachelor of Science - 4 Year BACHELOR OF ENGINEERING IN ELECTRICAL

FACULTY OF ENGINEERING & TECHNOLOGY , MSU VADODARA
VADODARA
03.2019

Skills

  • Electrical Engineering
  • Project Management
  • MEP Engineering
  • Budget Adherence
  • Fire Alarms Systems
  • Technical Support
  • Quality Management
  • Energy Management
  • Data Collection & Analysis
  • Conversant with ERP platforms such as SAP

Timeline

MEP Project Manager

METCO LLC, OMAN
01.2024 - Current

Deputy General Manager Electrical , E-5 Scale, PSU

BSNL
10.1999 - 06.2023

Manufacturing Team Member

GE Plastics India
10.1996 - 09.1999

Bachelor of Science - 4 Year BACHELOR OF ENGINEERING IN ELECTRICAL

FACULTY OF ENGINEERING & TECHNOLOGY , MSU VADODARA
Pravin Nigam