An accomplished and aspiring professional with experience in maintenance mechanical field. Excellent problem-solving skills, breaking down problems, quickly establishing root cause and solutions, driving issues to resolution. Creative and analytical professional with outstanding troubleshooting and communication skills. Pursuing a challenging position in a prestigious organization that will allow to utilize my skills and to gain additional experience for the progress of the company/organization Dedicated professional with extensive knowledge of mechanical technologies, tools and practices. Designs and develops equipment to improve prototypes and products. Experienced in leading projects from initial conception to completion within customer budget. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

5
5
years of professional experience
5
5
years of post-secondary education
3
3
Languages

Work History

Mechanical Engineer

NOMAC
10.2018 - Current
  • During the past 5 years I was responsible to ensure Ibri power plant '4
  • GTs and 2
  • STs' with all auxiliary systems running smooth
  • In addition, I was involved on 5
  • GTs C-inspection and I was selected to lead steam turbine - steam line modification with EPC.

Education

Bachelor of Science in Engineering - Mechanical Engineering

University of Michigan-Dearborn
09.2012 - 05.2017

Skills

Organisationundefined

Accomplishments

  • Leading 5 gas turbine major outages and one steam turbine medium inspection.
  • Leading and supervising 2 NO’s steam turbine piping modification projects and completed both of them before deadline to support plant OWNER to provide power to Oman Grid.
  • Leading plant condition monitoring (vibration) activates and giving other plants instruction how to do same to maintained equipment's of good shape.
  • Plant safety champion 2 time last year - by begin example for other on following all procedures and requirement's to preform work safe.ly
  • Assigned as Management Of Change champion (Process Safety) of the plant and leading all audits on this.
  • Generating SAP Preventive Maintenance Task list for the plant, starting from COD.
  • Leading in the plant HIRA Identification Process from mechanical side.

Roles And Responsibilities

  • Planning and executing of plant’s steam and gas turbines outages in accordance with LTSA and LTMA contracts.
  • Maintaining and inspecting of gas turbine and steam turbine special tools in regular basis.
  • Working side by side along with AEN and outage team on major gas turbine outages (Ansaldo GT26). Which include: reviewing the plan, procurement of required spares and consumables, coordinating with third party services, and setting the meeting with OEM and site management.
  • Participating on annual inspection of the boiler, and arranging all required services for the inspection and repair recommendation.
  • Review plant rotation equipment defect history along with preventive maintenance and vibration reports and develop a plan afterward to optimize rotating equipment reliability and life.
  • Participate on compressors and pumps trouble shooting, failure RCA, and procurement of compressors and pumps spares and consumables.
  • Leading maintenance mechanical department activities and set consolidated monthly plan for all mechanical activities and work orders including PM’s, CM’s and CBM’s.
  • Plant focal person of plant condition monitoring activities which include oil analysis, vibration analysis.
  • Perform engineering calculations to support design work. And Trouble shooting and investigation on different plant equipment defects including rotating and static equipment.
  • Collaborate with multi-disciplinary engineering teams, and work with vendors and contractors. Coordinate and review static equipment (valves, heat exchangers and tanks) PM and CM activities and provide technical judgements and improvements to ensure equipment safety and reliability.
  • Perform detailed documentation to track project development and design process
  • Ensure project timeline is met and project stays within budge.
  • Planning mechanical department ‘s corrective and preventive maintenance workorders through SAP, and creating a monthly report at the end of each month.
  • Compile all required information/data/records on installation, maintenance and repair work done on mechanical equipment of the plant for necessary reporting. As well Coordinate and review lifting gears and lifting equipment certification and inspection with third part certification and inspection with third party.

Awards

  • Employ of the month - 2 times "April 2019 and Jun 2021"
  • Recognition from the OWNER of the plant "AGC" - As I manage to completed Steam line modification project before deadline