Summary
Overview
Work history
Education
Skills
Languages
Custom
Personal Information
Timeline
Generic
Vasantha Kumar

Vasantha Kumar

Chennai,India

Summary

A challenging job with ample chance for growth and learning. To provide a meaningful contribution to the development of the organization.

· More than 17 years of experience in Tendering, Project Management, Maintenance Planning, Fabrication,Erection, QA/QC in reputed companies in GCC and India.

· Well experienced in independently handling Oil & Gas Projects.

· Planning of resources such as manpower, materials, consumables etc for projects.

· Preparation of Method Statements, Schedule guidelines and assisting Planning Department to prepare effective schedule.

· Familiar with internationally standardized welding, pressure vessels, NDT, ASME and API codes & standards.

· Experience in quality aspects of welding and painting.

· Good knowledge in construction industry through involvements in multidisciplinary projects comprising Civil/ Structural, Mechanical/ Piping, Electrical, Instrumentation.

· Planning and co-ordination for the execution of project and maintenance work associated with oil and gas fields in process, utilities, storage and support systems.

Overview

21
21
years of professional experience

Work history

Asst. Project Manager

Bashaer Gulf Projects LLC
SOHAR, Oman
2023.03 - Current
  • · Maintenance works in 76 Meter Dia Tank (TK-6102) in OQ Refinery with the client STS
  • · EPC Piping works for Sludge processing unit in OQ refinery with the client MKG LLC
  • · RFCC internal parts replacement works in OQ refinery shutdown
  • · TA 2023 - BWRO Tank 7.5 Meter Dia Shop build Tank Fabrication and erection with the client STS
  • · Responsible for execution Project Management OQ – RFCC Internals for TA Shutdown.
  • · Successfully Completed in Orpic Storage Tank -T6102 (76 mtr Dia x 22 Mtr Height) Roof Structure Replacement, Column Leveling ,Shell Jacking Plumbness Rectification.
  • · Successfully completed of REI Skid Packages of 295 Ton – ENI Congo off Shore.
  • · OQ – Burami Science Center Training Shed Fabrication & Installation Successfully Completed.
  • · Approved writings necessary to keep work flowing. Coordinated the response to all technical questions and deviation requests.
  • · Interfaced with the assigned group preparing the fabrication and assembly methodology and Statements of Work for assigned units.
  • · Worked with the Project Manager and Project Controls to establish detailed schedules and milestones for assigned units.

Project Engineer

M/s.Durian Steel LLc
Sohar,Misfa, Rumaila oil operation
2019.01 - 2023.02
  • · Projects worked in L&T – MFY Helideck - MIP II Mirjan Saudi Aramco Project - 681 ,521 & Sea Fastening, STS – Yibal Fire water Tanks, Storage Tank, bottom, Annular, Roof structure replacements
  • Coke Calcined Plant Boiler , Fin Fan ,Duct Chimney , Pump House , Chemical Injection System Fabrication & Installation project successfully completed.
  • Storage Tank, Gantry Hoist, Laddle bridge, Enabling structure, Off Shore Jacket & Pipeline ,Structural Fabrication.

Workshop & Site Supervisor

M/s.Arabian industries, MBU
Basra , Rumaila Oil Field, Rumaila oil operation
2013.11 - 2018.12
  • · Pipeline & Oil storage tanks, Wash water tanks fabrication and field erection works in British petroleum Rumaila Oil and Gas field operation in SOC.
  • · Exxon Mobil west Qurna 1 oil field – Degassing station separator Maintenance:
  • Projects: Oil Storage tank rehabilitation of Bottom plates, Annular plates, Shell plates, Roof Structures & plates and Foam piping, Chamber piping replacements.
  • Project: DS 8 Train A Stage 1 Vessel Cleaning & repair works
  • Removal of filters, sludge removal, Weld repair plan and Anode Installation, Coating application, Hydrotest process & Final commissioning.
  • · Fabrication & erection of structural columns, beams and E.O.T cranes for the New Fabrication Bay and Paint Shop in North Rumelia Manufacturing Facilities.
  • · Zubair oil field development project – Pipeline headers and spools work shop fabrication works successfully carried out as per the target time line for M/s Eni client.
  • · Successfully completed the BP & Exxon Mobil Oil field shutdowns in Degassing stations.
  • · To prepare the Inspection schedule in coordination with production schedule.
  • · To plan the day to day activities for Fabrication and welding section.
  • · To organize the welding process methods and achieve the time line planning.
  • · To prepare the cutting plan layout for fabrication structural tanks, skid mounted packages.
  • · Checking the drawing whether it need any correction according to the field and make as build preparation.
  • · To allocate sufficient skilled and talented workers on their jobs.
  • · Arrange proper materials and equipment’s for the fabrication team.
  • · Checking and cross verification of the fabrication layout markings.
  • · To coordinate during the Hot tapping works for HITRA permit works in the field.
  • · Pipe line Spool, Manifold, Pipe Supports fabrication and Field Erection works.
  • · Pipe spool management as per the system line id and prepare for the RT and PWHT process.
  • · Spool modification as per the site condition and modify the drawing as per the as built condition.

Piping Supervisor

M/s.NBTC
Mina Almahadi, MAB
2016.05 - 2017.05

KNPC- MAB 2

Clean Fuel Project for FDH (Flour Daewoo, Hyundai JV)

  • Pipe line Spool , Manifold , Pipe Supports fabrication and Field Erection works.
  • Pipe spool management as per the system line id and prepare for the RT and PWHT process.
  • Spool modification as per the site condition and modify the drawing as per the as built condition.
  • To plan the day to day activities for Fabrication and welding section.
  • To organize the welding process methods and achieve the time line planning.

Quality Assurance Team - Welding & Fabrication

M/s.Kobelco Cranes India Pvt. Ltd ,Heavy Engg Fab
Sricity, Andrapradesh, India
2013.05 - 2013.11
  • Heavy engg Fabrication - Crawler Cranes( Japan MNC)
  • · New product development of Fabrication – Structural Frames, Crawler, Car body , Upper frame as per the drawing standards and customer requirements.
  • · Boom Pipe Insert ,Lower, Upper, Jib & Luffing booms fabrication.
  • · Ensure the MPT, UT & DPT checking as per the drawing specification.
  • · Ensure the daily production & Quality requirements as per the planned activities.
  • · Ensure the stage wise process In - process Inspection as per the check list requirements.
  • · Prepare the Weld Matrix detail as per the weld symbol representation.
  • · Ensure the correctness of sub assly. setting fixtures and welding fixtures as per the planned schedule.

INCHARGE Mech. Welding & Fabrication Section

M/s. Epcco.
Dammam, Kingdom of Saudi Arabia
2010.05 - 2012.05
  • Welding & Fabrication Section
  • Prepare schedules of the daily activities of his subordinates and the work –requirements need to productively complete a work order.
  • · Ensure the productive use of material and spare parts and sees to it that wastage is minimized.
  • · Ensure that fabrication jobs are made as per the specifications and drawing standards.
  • · Fabrication of rotary kiln ( 3500 mm dia x 70 mtrs length,200 tons)
  • With complete weld joints are 100 % UT tested.
  • · Erection of Rotary kiln in the support rollers @ 25 mtr. level elevation.
  • · Fabrication of Cyclone separators, Dip tube, Meal chute pipes.
  • · Fabrication and erection of Stainless steel pre heater cyclones.
  • · Fabrication and erection of Blower casings, Impellers, suction duct pipe lines, Storage Micro silca hoppers, Structural columns.
  • · Ensure that complete works as per the planned activities during plant maintenance shutdowns.
  • · Erection & Fabrication of High pressure vessel Gas storage tanks & Hydraulic pressure tanks, Oil dosing systems.
  • · Pipe line valve replacement & modification works as per the drawing.
  • · Ensure that complete daily manpower recourse transaction in ORACLE system.

Asst. Quality Assurance Engineer

M/s.Greaves Cotton Limited
Gummidipoondi, India
2006.07 - 2010.05
  • One of the Leading Manufacturers of Heavy Tandem Roller, Light Tandem Roller ,Vibrating Compactor, Concrete Pump ,concrete mixers and Batching plant.
  • Customer Service on Quality, Design and Engineering requirements.
  • Preparation of WPS/WPQ/PQR for Customer Approval
  • Inspection of Receiving materials, In-Process Work, Welding aspects.
  • Inspection of Fabrication Items – Batching plant skip structure, Pan mixer, Skip bucket, Winch drum assembly , Boom bracket assembly, Clutch assembly, Hydraulic assembly , Pneumatic assembly, Load cell calibration, Proximity sensor and Limit switch Function checking.
  • Process audit carried out at supplier ender as per Process sheet, Check sheet , Control plan ,Ensuring calibration status.
  • Special task carried out at BANGALORE EXCON 2009 industrial infrastructure exhibition for erection of Batching plant 60 cbm.
  • Hydraulic NAS level checking with Dust Particles.

QC & Production Engineer

M/s. Precision Controls
Ambattur, Chennai, India
2003.05 - 2006.06
  • Heat treatment Furnaces, Rotary Kilns, Vaccum Chambers, Autoclaves & Ovens, Glove Boxes
  • One of the Leading Manufacturers of Heat treatment Furnaces, Rotary Kilns, Vaccum Chambers, Autoclaves & Ovens, Glove Boxes in India. Our Major Customers are BARC, B.H.E.L, N.F.C, L&T, IGCAR, Usha Martin, SFL, Bay Forge, Carborundum Universal, TI, and Pooja Forge. We are also Exporting Furnaces to Saudi Arabia, Dhaka, Iran, and Indonesia.

QC & Supervisor

M/s. IGCAR
Kalpakkam
  • Steam Generator Test Facility

Apprentice Trainee in Inspection & Quality Control Dept.

M/s. Binny Engineering Ltd.
Meenambakkam, Chennai
  • Inspection & Quality Control Dept.

Education

Diploma in Mechanical Engineering -

Thai Moogambigai Polytechnic
Chennai, Tamil Nadu

Skills

  • ASNT Level -II (American society of non – destructive testing) (VT, DPT, UT, RT, MPT)
  • Project Budgeting , Cost Control Monitoring Budget Vs Actual Each Cost Center and Achieving the Project Delivery on time
  • Undergone training in AUTOCADD 2000 at CADD center
  • Trained in ISO 9001:2000 internal auditor certified by BVQI
  • MS office : Word, Excel and Power point, MS Project
  • ERP Operating software knowledge: ORACLE, SAP

Languages

English, Hindi, Arabic, Tamil, Malayalam
Beginner
English
Fluent
Hindi
Advanced
Arabic
Intermediate
Tamil
Native

Custom

00968 97559291, 00919840150623

Personal Information

  • Passport Number: N5005653
  • Passport Date Of Issue: 12/17/15
  • Passport Place Of Issue: Chennai
  • Passport Expiry Date: 12/16/25
  • Father's Name: B. Venugopal
  • Date of birth: 05/14/83
  • Nationality: Indian
  • Marital status: Married

Timeline

Asst. Project Manager

Bashaer Gulf Projects LLC
2023.03 - Current

Project Engineer

M/s.Durian Steel LLc
2019.01 - 2023.02

Piping Supervisor

M/s.NBTC
2016.05 - 2017.05

Workshop & Site Supervisor

M/s.Arabian industries, MBU
2013.11 - 2018.12

Quality Assurance Team - Welding & Fabrication

M/s.Kobelco Cranes India Pvt. Ltd ,Heavy Engg Fab
2013.05 - 2013.11

INCHARGE Mech. Welding & Fabrication Section

M/s. Epcco.
2010.05 - 2012.05

Asst. Quality Assurance Engineer

M/s.Greaves Cotton Limited
2006.07 - 2010.05

QC & Production Engineer

M/s. Precision Controls
2003.05 - 2006.06

QC & Supervisor

M/s. IGCAR

Apprentice Trainee in Inspection & Quality Control Dept.

M/s. Binny Engineering Ltd.

Diploma in Mechanical Engineering -

Thai Moogambigai Polytechnic
Vasantha Kumar