Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Timeline
Generic

Tareq Alabbas

Lead Electrical Engineer
Muscat,Muscat

Summary

Systematic Electrical Engineer experienced in managing electrical project lifecycle from design phase to delivery and implementation. Polished in analyzing, troubleshooting and developing solutions. Consistently delivers engineering services to meet company, customer and statutory and regulatory specifications on time and within budget. Resourceful Electrical Engineer offering 16-year background developing and designing new electrical systems and testing equipment. Diligent and analytical professional certified in Siemens and proficient in AC/DC motor drives, high voltage cabling and preliminary electrical design. Comfortable handling multiple projects simultaneously with little to no supervision.

Focused Electrical Engineer with background in power systems, automation and controls. In-depth understanding of control and power-delivery systems. Experienced in developing technical studies and investigations. familiar with all major engineering standards associated with control gear components and electrical power stations.


Overview

15
15
years of professional experience
4
4
years of post-secondary education
1
1
Certification
2
2
Languages

Work History

Senior Electrical & Instrument Engineer

Muscat, Energo Projekt Entel
10.2021 - Current
  • Follow all electrical design review work for Substation:
  • Load list calculation for HV and LV
  • Reviewed specifications, drawings and project manuals.
  • Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
  • Review Cable sizing Calculation for HV & LV
  • Review33KV GIS calculation
  • Review 20 & 10 MVA 33/11 Transformer calculations.
  • 33KV OHTL Calculations.
  • Indoor and outdoor Lighting system calculation
  • Auxiliary Transformer data sheet calculation
  • LV switchgear data sheet calculation
  • SLD for HV & MV
  • Earthing system calculation
  • Lightning protection system.
  • UPS Equipment
  • Control & Relay Panels Panel.
  • SCADA RTU panel
  • Capacitor Panel for HV
  • Follow all electrical design review work for Pump station:
  • Electrical Medium voltage Motors calculation
  • UPS Equipment
  • Lightning protection system.
  • 11KV switch gear data sheet calculation.
  • 415V LV Switch gear data sheet calculation.
  • Capacitor Panel for LV
  • VFD (variable Frequency Drive) for medium voltage Motors data sheet calculation.
  • HVAC MCC Panel Calculation and SMDB.
  • Auxiliary Transformer data sheet calculation
  • LV switchgear data sheet calculation
  • Cathodic protection calculation
  • Earthing system calculation
  • Answered calls, responded to emails, and spoke with clients face-to-face.
  • Processed a range of documentation and entered information into databases.
  • Planned all project resources and budgets.
  • Implemented and approved design control procedures for electrical development in accordance with regulatory guidelines.
  • Applied appropriate engineering methods to project discipline standards.

Senior Electrical Engineer

AAW
Suhar
11.2018 - 10.2021
  • Follow all electrical design review work
  • Reviewed specifications, drawings and project manuals.
  • Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
  • Follow FAT procedure:
  • 11kV switch gear (TAMCO Made in Malaysia)
  • 20MVA, 10MVA & 6MVA Power Transformer 33/11.5 KV (Volt amp Make-Oman)
  • Capacitor Bank (SUV ire-UAE)
  • Control & Relay Panels (Jyoti Sohar, ETA-UAE, Al Assr- Oman)
  • SCADA RTU panel (UIS-Oman)
  • 11KV 3-Phase induction Motors (Hyundai -South Korea)
  • Evaluated electrical installations and systems to isolate faults and implement corrective actions.
  • Performed in-depth electrical acceptance testing of completed hardware.
  • Mentored junior engineers and new hires in job-specific tasks and application of electrical processes.
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Supervised construction and pre-commissioning of electrical rooms and substations.
  • Planned all project resources and budgets.
  • Coordinated design, tests and build activities between cross-functional teams.
  • Monitored manufacturing operations of electrical devices for compliance with safety protocols.
  • Initiated project management knowledge study and subsequently standardized project management practices.
  • Designed concepts that included module placements, conduit routing and inverter locations.
  • Calibrated and repaired existing systems to maintain functionality.
  • Administered both energized and de-energized testing on multi-design change packages.
  • Reduced electrical construction hazards with upgraded safety policies and stringent enforcement.
  • Developed engineering documentation detailing system requirements and diagnostic procedures.
  • Verified viability and compliance for systems and circuits.
  • Proposed electrical product and system modifications to improve quality and efficiency.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Used established formulae to calculate current loads and short circuit currents.
  • Validated product and subsystem performance through simulation and laboratory testing.

Electrical & Instruments Engineer

AAW
Bisyah
01.2016 - 10.2018
  • Follow all electrical works, review, Testing, Inspection &commission Such as:
  • Performed in-depth electrical acceptance testing of completed hardware.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Proactively participated in meetings and helped create new practices.
  • Handled customer complaints with empathy and composure.
  • Consistently met my short and long-term targets.
  • Load list calculation for HV and LV
  • Cable sizing Calculation for HV & LV
  • Lighting calculation
  • Cathodic protection calculation
  • MV switchgear & soft starter data sheet calculation
  • LV switchgear data sheet calculation
  • Auxiliary Transformer data sheet calculation
  • SLD for MV & LV
  • Earthing system calculation
  • Electrical Motors calculation
  • UPS Equipment
  • Motor Control Centre
  • Surge Protection System
  • IP Video Recording System
  • Electronic Access Control / Intrusion Detection
  • Major Equipment Installed, Tested and Commissioned under supervision:
  • 33kV Switch gear (Schneider-Germany, Siemens- Germany,).
  • 11 KV Switch gear (Jyoti Sohar-Oman, Al-Hassan-Oman &
  • Al-Assr Switchgear)
  • 10MVA, 20MVA 33/11.5 kV power transformer (Volt-Amp- Oman, Emirates-UAE).
  • 33kV and 11kV XLPE Cables (Oman Cable Industries Oman-Oman, Nahass-Oman).
  • 33kV Control Relay Panel (Jyoti Sohar-Oman, ETA-UAE, Power Economy-UAE and Al Assr-Oman)
  • Scada and RTU panel (UIS, ABB, Power Economy & SELTA)
  • MV Soft starter form (AuCum Germany)
  • Helped management to identify work ow issues and solutions.
  • Proactively participated in meetings and helped create new practices.
  • Consistently met my short and long-term targets.
  • Single Line Diagram
  • Earthing system
  • Lighting Layout
  • Small Power Layout
  • Lighting Small Power Db Schedule
  • Fire Alarm System Detector
  • LV Power Cable Schedule
  • Cable Routing Layout Drawing
  • Security System
  • Follow all instrument works, review, Testing, Inspection & commission such as:
  • Consistently met my short and long-term targets
  • Handled customer complaints with empathy and composure
  • Proactively participated in meetings and helped create new practices
  • Answered calls, responded to emails, and spoke with clients face-to-face
  • Processed a range of documentation and entered information into databases.
  • Evaluated electrical installations and systems to isolate faults and implement corrective actions.
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Administered both energized and de-energized testing on multi-design change packages.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
  • Proposed electrical product and system modifications to improve quality and efficiency.

Electrical & Instruments Engineer

EnergoProjkt Entel
Nizwa
01.2012 - 01.2016
  • Performed in-depth electrical acceptance testing of completed hardware.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Evaluated electrical installations and systems to isolate faults and implement corrective actions.
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Supervised construction and pre-commissioning of electrical rooms and substations.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
  • Proposed electrical product and system modifications to improve quality and efficiency.
  • Monitored manufacturing operations of electrical devices for compliance with safety protocols.
  • Reduced electrical construction hazards with upgraded safety policies and stringent enforcement.

Follow all electrical works, review, Testing, Inspection &commission Such as:

  • Single Line Diagram
  • Earthing system
  • Lighting Layout
  • Small Power Layout
  • Lighting Small Power Db Schedule
  • Fire Alarm System Detector
  • LV Power Cable Schedule
  • Cable Routing Layout Drawing
  • Security System
  • CCTV System, Access Control System
  • 11/0.4 transformers with all accessories (RMU, HFU, and OLU)
  • 11KV underground cable from existing Tapping point to the Transformer

Follow all instrument works, review, Testing, Inspection & commission such as:

  • PLC Respond
  • Instrument I/O List
  • Cable Schedule
  • ICTD (Instrument Cable Termination Diagram)
  • Commissioning Of PDH/SDH/PABX/Radio
  • Testing, Commissioning and Maintenance for the PLC, HMI SCADA
  • Reporting and Signature of the Test Reports
  • Troubleshooting In Case Of Problems
  • Instrument layout
  • Cable rout layout
  • Function logic diagram
  • Instrument loop diagram
  • Datasheets
  • Alarm and trips settings
  • CCTV System, Access Control System
  • Function logic diagram.
  • Instrument loop diagram Datasheets.
  • Alarm and trips settings.

Electrical site Engineer

STX
Aldywanieh
01.2010 - 01.2012
  • Deputy Project Engineer for Consultancy Engineering Services Installation, testing, commissioning, and maintenance of Hyundai diesel generator (8 units) size one of them 10MW in east Al dywanieh grid station in Iraq with OHL 220KV
  • Inspection, testing and commissioning, of All of power GIS 220KV and 500 MW dual Step Up Transformers
  • Inspection, testing and commissioning 220KV OHL long approximate 80KM .
  • Coordinated materials delivery and organization to maintain smooth flow of work.
  • Inspection, testing, commissioning SCADA Panel of Siemens PLCs type Sematic S7 system handling all types (1200, 400,300) by using WinCC ladder program.
  • Learned new skills and applied to daily tasks to improve efficiency and productivity.
  • Carried out day-to-day duties accurately and efficiently.
  • Checked work quality and compliance with design specifications.
  • Checking and Inspection of UPS for emergency unit.
  • Arrange the coordination and progress meeting with contractor
  • Monitoring the progress and quality of works daily & weekly basis.
  • Attending the progress review meeting with project management team of client &consultant.
  • Fallow up with site engineer for daily & weekly progress to achieve the forecast target.
  • Inspection of work to verify quality and adherence to safety, regulations, and specifications
  • Consistently met my short and long-term targets.
  • Proactively participated in meetings and helped create new practices.
  • Verified on-time deliverables within budget parameters through effective management of project milestones.
  • Read and interpreted blueprints, diagrams and schematics to correctly coordinate work.
  • Negotiated schedules, work plans and payment structures with subcontractors.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Performed in-depth electrical acceptance testing of completed hardware.
  • Evaluated electrical installations and systems to isolate faults and implement corrective actions.
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Evaluated power needs for various systems.
  • Reduced electrical construction hazards with upgraded safety policies and stringent enforcement.
  • Estimated project costs and resource allocation to forecast budget requirements and monitor adherence.
  • Leveraged mastery of AutoCAD Electrical Toolset to develop and document electrical schematics.

Power Electrical Engineer

NA-LIDCO
Benghazi
12.2007 - 01.2010

Supervise the execution of Site work. Such as Survey, Foundation, Tower Erection & Conductor stringing by TSE etc.

  • Monitored installation and operations to consistently meet rigorous customer requirements.
  • Preparation Engineering Drawings designs, Earthing layout calculation, Cable Schedule, Line Profiles, stringing Charts etc
  • ·Monitoring Projects, Cost & Resource Development by Progress reports, Bar charts and maintaining track for the timely execution of project ·Responsible for Project Co-ordination at HO and site, Regular follow up with Site & Client and Address issues at site.
  • Improved methods for measurement, documentation and work flow management.
  • Conducted projects and performance presentations to clients and company executives.
  • Applied principles of electrical theory to advance and improve product development and efficiency.

Education

Bachelor of Science - Electrical, Electronics Engineering Technologies

University of Technology
Baghdad,Iraq
05.2002 - 05.2006

Skills

Teamwork Problem-Solvingundefined

Accomplishments

  • SIMATIC HMI WINCC program [SCADA] System Handling STBWINCCS (Siemens Certificate)
  • S7 System Handling ST-7SYH (Siemens Certificate)
  • Uninterruptible Power Supply System (UPS), maintains &applications
  • CERTIFICATE_FOR_PROJECT_MANAGEMENT_TRAINING_PMP174_TEST

Certification

SCADA , Seimenis Certificate

Timeline

Senior Electrical & Instrument Engineer

Muscat, Energo Projekt Entel
10.2021 - Current

Senior Electrical Engineer

AAW
11.2018 - 10.2021

Electrical & Instruments Engineer

AAW
01.2016 - 10.2018

Electrical & Instruments Engineer

EnergoProjkt Entel
01.2012 - 01.2016

Electrical site Engineer

STX
01.2010 - 01.2012

SCADA , Seimenis Certificate

05-2009

Power Electrical Engineer

NA-LIDCO
12.2007 - 01.2010

Bachelor of Science - Electrical, Electronics Engineering Technologies

University of Technology
05.2002 - 05.2006
Tareq AlabbasLead Electrical Engineer