Both Oman and Pakistan experience
- Experience of Hardware Installation of MSC & BSC
- Work on PTCL CDMA project of (fcb installation at remote side's)
- Work on installation of msc project of Zong
- Installed Huawei cabnet's and also power up pdf from rectifier
- Installed ddf,pdf,odf,mdf
- Work on mega swap datacom project of Mobilink
- Work on media gateway installation of Huawei at nayatel side
- Work on fiber's connectivity (single and multimode)
- Work on both ac & dc power supplies
- A lot of experience of laying and addressing dc and ac power cable on lader's and cable tray
- Work on laying and addressing fiber, copper wire
- Work on indoor and also at outdoor side's in very difficult conditions
- Work on troubleshooting coper and fiber links
- Able to make copper connector's RJ45,BNC contentor
- Work on tag blog punching
- HWI of MSan
- Knowledge about C5 project e.g HWI ,Swap, Jumpering, receiving and troubleshooting
- HWI of Bss sites CM Pak,Mobilink,Ufone.
- Oman Tel (Hardware Installation & Swap U900,LTE800,LTE1800)
- Oman Tel (Hardware Installation & MigrationCX600/X8/OLT/Gpone/C5/RCN/ATN/OSN/BONT)
- Ooredoo (Hardware Installation & Swap, NewTk,LTE1800,LTE800)
- 5G Hardware installation and Integration
- Vodafone Hardware Installation