Summary
Overview
Work history
Education
Skills
Websites
PROJECT EXECUTED
Accomplishments
Certification
Languages
Affiliations
Timeline
Generic

SHASHIKANT MISHRA

Deoria,India

Summary

Accomplished professional with extensive expertise in piping and fabrication, overseeing the supervision of over 3,260 inch-dia of piping fabrication and erection recently, including complex high-elevation structural configurations. Proficient in hydrostatic testing across diverse pressure holdings and materials such as Carbon Steel, Stainless Steel, and Duplex. Adept in industry standards including ASME B31.3, B31.4 & B31.8, and ASTM specifications. Skilled in AutoCAD 2021, AVEVA E3D, SP3D, and MS Excel for advanced project execution. Demonstrates strong leadership in executing projects within deadlines without lost time injuries while maintaining a focus on quality assurance and risk evaluation.

Offering strong problem-solving skills and solid understanding of construction processes. Knowledgeable about project management principles, team collaboration, and site safety protocols. Ready to use and develop skills in site supervision, project planning, and quality control in Field Engineer role.

Overview

8
8
years of professional experience
6
6
years of post-secondary education
1
1
Certification

Work history

Senior Site Engineer / Piping Specialist

Al Tasnim Enterprises LLC
MARMUL, Oman
2022.04 - 2026.06
  • Managed mechanical fabrication and erection of heavy-diameter carbon and stainless piping networks.
  • Prepared weld maps, spool selection reports, and fabrication sheets for each spool.
  • Delivered 3260 inch-diameter fabrication across carbon steel and duplex roto-lined systems.
  • Executed rigging alignment for 20 inch spools within multi-tier pipe racks.
  • Maintained AFC drawing support standards and verified structural clearance for spools.
  • Prepared and executed hydrotest packages covering around 2 km of spools.
  • Held 76 bar and 360 bar pressure for carbon steel process lines during hydrotesting.
  • Held 74 bar pressure for stainless steel 316L/304 corrosion-resistant lines during hydrotesting.
  • Led mid-stream takeover of 12 km 16 inch high-pressure pipeline header.
  • Resolved severe hydrostatic test challenges during compressed turnaround for 220 bar header.
  • Coordinated with CCMS personnel to update and clear MCDAC and PCDAC certificates at commissioning.
  • Facilitated technical reviews of piping designs for quality control checks.
  • Optimized resources by planning spool fabrication and installation sequencing across projects.
  • Completed projects on time through structured time management and daily follow-up.

Site Engineer

Al Tasnim Enterprises LLC
MARMUL, Oman
2021.03 - 2022.04
  • Installation of crude gathering station. Consist of Installation of Skid of Multiport Selector Valve (MSV) installations (316L), fabrication of piping spool of station, materials SS/ CS/ LTCS/ DSS, Sizes range 2" up to 18" header and crude station modifications, planning isolation, critical facility markup, major valve markup, draining, pigging and flushing of line.
  • Execution of on-plot hookup piping fabrication material CS A106, major sizes 4" and 6", pigging, gauging, installation of HDPE liner, On plot well piping installation, Planning hydrotest, Well hook-up modification, planning isolation of well, draining, pigging, line flushing.
  • Weld markup, As-build preparation, weld history , Job execution MOS preparation, specific job Risk Assessment, work related JSA, HSE observation Close out report. CCMS co-ordination, A punch list, B punch list close out report preparation.
  • Maintained zero Lost Time Injury (LTI) safety record by enforcing strict Permit to Work (PTW) and Lockout/Tagout (LOTO) protocols.

Site Engineer

RBP Engineering & Construction
Mumbai, India
2018.04 - 2021.03
  • Supervised piping spool fabrication, fit-ups, and field modifications for downstream plant maintenance.
  • Utilized precision gauges, calipers, and micrometers to execute quality control and dimensional checks.

Education

B-Tech - Mechanical Engineering,8.34 CGPA

JNTU Anantapur
Anantapur, India
2014.03 - 2018.04

SENIOR SEC. SCHOOL - MATHS 63%

Central Academy
INDIA
2011.03 - 2013.04

Skills

  • Piping & Fabrication: Over 3,260 inch-dia of piping fabrication and erection supervision, including heavy 20" spool handling and alignment
  • Structural Erection: Erection of complex piping configurations in high-elevation and high-density pipe racks
  • Hydrostatic Testing: Advanced execution of hydrotests spanning over 6 km of piping spools with diverse pressure holdings (76 Bar CS, 74 Bar SS, and 360 Bar Water Supply lines)
  • Materials Expertise: Carbon Steel (CS), Stainless Steel (SS/316L/304), and Duplex (S31803)
  • Codes & Standards: ASME B313 (Process Piping), ASME B314 & B318, and ASTM specifications
  • Software Skills: AutoCAD 2021, AVEVA E3D, SP3D, and MS Excel(VLOOKUP, PIVOT TABLE, ADVANCE FILTER)
  • Leadership strength- Execution of severe project within stipulated deadline, without any lost time injury
  • Familiarity with cad software- Conversant with Auto-Cad, and E3D software for easy and handy in execution of project
  • Interpersonal aptitude
  • Risk evaluation
  • Quality assurance focus

PROJECT EXECUTED

36" INTEGRITY REMEDATION PROJECT

  • Description- Fabrication of over 1600 inch diameter and erection of 36" Diameter of 16 number of spool inside the operation plant in the brown field area,
  • Diameter-4" to 36"
  • Material- CS+Roto Lined

Thamrah Field Devlopment Project

  • Description- installation of 5 Multi Selector Valve skid 900 to 1200 inch diameter spool fabrication and 1 Chemical injection skid and 1 Relief Valve skid further connected from Skid to Storage tank.
  • Diameter- 2" to 18"
  • Material - CS A106/ SS 316 l/ LTCS A333/ DSS S31804

Maurid West Devlopment Project

  • Description-Fabrication of over 3240 inch diameter and erection of 20" Diameter of 43 number of spool inside the operation plant in MMPS in the brown field area,
  • Daimeter-2" - 20"
  • Material-CS A106 / SS 316l

GNR InField Devlopment Project

  • Description- installation of 4 Multi Selector Valve skid 900 to 1200 inch diameter spool fabrication and 2 Chemical injection skid and 1 Relief Valve skid further connected from Skid to Storage tank.
  • Diameter- 2" to 18"
  • Material - CS A106/ SS 316 l/ LTCS A333/ DSS S31804

OFF-PLOT DELIVERY CONTRACT (ODC C31 /1164)

  • DESCRIPTION- Fabrication and installation of several on-plot well Hookup piping spool each well consisting approximate 60" to 114" diameter of fabrication,
  • Diameter- 4" to 6"
  • Material- CS A106

Accomplishments

  • Recently commissioned a 900 in diameter Project fabrication, erection and installation hydrotesting at 74 bar pressure, within 3 month of tight schedule.
  • Received SUKRAN award from PDO for the best performances.
  • Received honorary Project execution award from PDO.
  • Received best HSE performance award from ATNM.

Certification

  • PDO Approved Permit Applicant – South (Marmul) Oman.
  • Certified Authorized Gas Tester & H2S Safety Trained.
  • AutoCAD- 2021
  • E3D
  • SP3D

Languages

English
Intermediate
Hindi
Upper intermediate
Arabic
Beginner

Affiliations

  • Music Listening, Trading

Timeline

Senior Site Engineer / Piping Specialist

Al Tasnim Enterprises LLC
2022.04 - 2026.06

Site Engineer

Al Tasnim Enterprises LLC
2021.03 - 2022.04

Site Engineer

RBP Engineering & Construction
2018.04 - 2021.03

B-Tech - Mechanical Engineering,8.34 CGPA

JNTU Anantapur
2014.03 - 2018.04

SENIOR SEC. SCHOOL - MATHS 63%

Central Academy
2011.03 - 2013.04
SHASHIKANT MISHRA