Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

RANAR MONDAL

Survey Engineer
Muscat

Summary

Career Summary Successfully completed +11years of field experience in LAND SURVEYING in various construction field: Electrical Transmission lines, underground electrical cable line, Cannel, Tunnel project, Thermal Power plant etc. With leading organization. Getting opportunities of challenging job with personal technical growth and financial prospect for the project. Good awareness with latest survey Instruments and its software, like to get opportunities of new challenging job of same field.

Overview

1
1
Language

Work History

Senior Surveyor/Draughtsman

TRADE LINKS &SERVICES Co. LLC
02.2017 - Current
  • Projects - Primary substation, Power transmission lines, 400kv,132kv,33kv & 11kvTransmission line, OHL & UG cable line
  • Clients - OETC, RAECO, MZEC, MAJAN
  • Ongoing Projects:
  • Construction of 33KV Feeders from Birkat Al Mouze Grid Station at Nizwa
  • Construction of Manah 400 kV Grid Station & Associated OHL LILO
  • Construction of 132kV single OHL: PDO Sayyala 132/33kV Grid SS to Osool33kV SS
  • Responsibilities:
  • All layouts & co-ordinate fixing at every structure by GPS and TOTAL STATION
  • Responsible for Tower foundation erection & alignment checking
  • Survey for 400kv,220kv,132kv,33kv ,11kv overhead line and cable line route
  • All type drawing updated by auto cad for client approval
  • As built drawings preparation for all infrastructure works
  • Verify the accuracy of survey data, including measurements and calculations
  • Conducted at survey sites
  • Conduct surveys
  • Establish legal boundaries for sites based on legal deeds and titles
  • Record the results of surveys, including the shape, contour, location, elevation, and dimensions of land or land features
  • Coordinate findings with the work of engineering and architectural personnel, clients, and others
  • Concerned with project Adjust surveying instruments to maintain their accuracy
  • Establish fixed points for use in making maps, using geodetic and engineering instruments
  • Career Timeline aa

IOT INFRASTRUCTURE

ENERGY SERVISES LTD
04.2015 - Current

· Section taken by Leica Pro

· Involve with survey related works.

· Auto cad designing for initial infrastructures, contouring and layout before starting of structure.

· Quantity Calculation and field measurement Work...

· Layout of stacker reclaimer, Crusher house, ERH, Conveyor, Boiler, ESP, Silo, Dm plant and Bolt Fixing etc.

· Responsible for steam turbine, generator foundation alignment checked and hand over to client

Surveyor

SENBO- NAYAK INFRASTRUCCTORE PVT.LTD, KM RAIL & TUNNELPROJECT
03.2016 - 01.2017
  • Responsibilities:
  • Close traverse of all control points 6 K.M
  • By total station for co-ordinate and digital level
  • For elevation
  • Responsible for pile point marking & Casing alignment checking
  • Responsible for Tunnel & Bridge survey, alignment foundation of gentry
  • Column bolt etc
  • Work
  • Arrange the data for pilling and certify with client before concrete pouring
  • Responsible for pier alignment, pedestal bearing alignment, pier head checking etc
  • Work
  • Attending weekly and monthly meetings for work progress discussion.

Surveyor

LANCO INFRATECTH LTD
05.2015 - 02.2016
  • Project: 2X 660 MW Thermal Power Plant, LANCO POWER
  • Responsibilities:
  • Section taken by Leica Pro
  • Involve with survey related works
  • Auto cad designing for initial infrastructures, contouring and layout before starting of structure
  • Quantity Calculation and field measurement Work..
  • Layout of stacker reclaimer, Crusher house, ERH, Conveyor, Boiler, ESP, Silo, Dm plant and Bolt Fixing etc
  • Responsible for steam turbine, generator foundation alignment checked and hand over to client

Surveyor

IVRCL INFRATECTH LTD
06.2013 - 02.2015
  • 3X 660 MW Thermal Power Plant, : NTPC
  • Responsibilities:
  • Involve with survey related work
  • Auto cad designing for initial infrastructures, contouring and layout before starting of structure
  • Quantity Calculation and field measurement Work
  • Layout of stacker reclaimer, Crusher house, ERH, Conveyor, Boiler, ESP, Silo, Dm plant and Bolt Fixing etc.

Assistant. Surveyor

IOT INFRASTRUCTURE & ENERGY SERVISES LTD, MW
04.2011 - 02.2013
  • Project: 1X 300, Client: Maruti clean coal & power Ltd.

IVRCL INFRASTRUCTURE & ENERGY SERVICES LANCO INFRATECTH LTD SENBO- NAYAK INFRASTRUCCTORE PVT.LTD TRADE LINKS & SERVICES Co. LLC
04.2011 - 02.2011


· Involve with survey related work.

· Auto cad designing for initial infrastructures, contouring and layout before starting of structure.

· Quantity Calculation and field measurement Work

· Layout of stacker reclaimer, Crusher house, ERH, Conveyor, Boiler, ESP, Silo, Dm plant and Bolt Fixing etc.

02.2017 - 1 1
  • 15 May’15

Education

Diploma - Civil Engineering

Mountain Institute of Management and Technology, Industrial Training Institute Gobordanga

undefined

Industrial Training Cheragram high school

Non-Technical - undefined

Higher Secondary - undefined

Chandpara bani, Deopul A.M. High School

Skills

Survey Instrumentsundefined

Accomplishments

  • Construction of 2x6 MVA, 11/33 KV Outdoor Primary Substation at Al hij Area and upgrading of Al Joubah Primary Substation from (1x3 MVA to 1x6 MVA, 33/11kV) at Wilayat Mahout-2017
  • Construction Of 2X6 MVA Primary SS 33/11kV with 33Kv Incomer Feeders for ROP Complex at Barkat Al Mouz-2017
  • Construction of (33/11kv) new Primary Substation 2x6mva at Magara south -2017
  • Construction of (33KV) Feeder from Farshat Qatbeet new Power station and installation of (2x6 MVA- 33/11.5 KV) PSS at Maqshin
  • Area and laying of (11KV) underground cable to connect with the existing network at Wilayat Maqshin-
  • 2017
  • Construction of 2x6 MVA IBRA ROP Primary S/S (33KV/11KV) with 33KV Incomer Feeders at Ibra in Al Sharqiyah -2017
  • Construction of 33/11KV networks with Distribution Transformers to feed power supply to Farms at Wilayat Ibri - Dahirah -2018
  • Construction of 132/33kV Bedyah Grid Station and Associated 132kV LILO Works-2018
  • Construction Of 33/11Kv 3x20MVA Primary Substation designated as Sultan Qaboos Hospital - II- 2019
  • Construction of 132/33kV Bedyah Grid Station and Associated 132kV LILO Works-2019
  • Construction of 2x20MVA (Hay Al Turath & Al Afiyah PSS), Upgrading of IZZ PSS to 2x20MVA -2020
  • Construction Of 2X20MVA (IWP Primary Substation- Asslah Area) with 33KV feeders at Ja'alan bani Bu Ali in
  • 2020
  • Construction of 132/33kV, 4x125 MVA Transformer at Madinat Al Mabela Grid station- 2021.

Timeline

Senior Surveyor/Draughtsman

TRADE LINKS &SERVICES Co. LLC
02.2017 - Current

02.2017 - 1 1

Surveyor

SENBO- NAYAK INFRASTRUCCTORE PVT.LTD, KM RAIL & TUNNELPROJECT
03.2016 - 01.2017

Surveyor

LANCO INFRATECTH LTD
05.2015 - 02.2016

IOT INFRASTRUCTURE

ENERGY SERVISES LTD
04.2015 - Current

Surveyor

IVRCL INFRATECTH LTD
06.2013 - 02.2015

Assistant. Surveyor

IOT INFRASTRUCTURE & ENERGY SERVISES LTD, MW
04.2011 - 02.2013

IVRCL INFRASTRUCTURE & ENERGY SERVICES LANCO INFRATECTH LTD SENBO- NAYAK INFRASTRUCCTORE PVT.LTD TRADE LINKS & SERVICES Co. LLC
04.2011 - 02.2011

Diploma - Civil Engineering

Mountain Institute of Management and Technology, Industrial Training Institute Gobordanga

undefined

Industrial Training Cheragram high school

Non-Technical - undefined

Higher Secondary - undefined

Chandpara bani, Deopul A.M. High School
RANAR MONDALSurvey Engineer