A highly skilled Mechanical Maintenance and reliability Engineer with expertise in preventive and predictive maintenance planning using SAP PM CMMS. Asset management, and reliability sustaining one of my targets . Certified in CMRP (Certified Maintenance & Reliability Professional) and PMP (Project Management Professional), I bring a solid understanding of mechanical systems, along with a proven track record of optimizing Overall Equipment Effectiveness (OEE) , minimizing downtime & reducing cost by implementing RCM methodology . Good knowledge in Kaizen , lean and six sigma quality philosophies' implementation . Insure Safety in workplace is majority .
1. The gas turbine: the main component, and Operating system
2. The steam turbine: the parts of the steam turbine, lubricating system, Cooling and Condensate System, and Operating System.
3. Heat Recovery Steam Generator (HRSG): The Parts of HRSG, and Steam generating.
🔹 Khartoum rod Re-habitation Project
🔹 Reliability-Centered Maintenance (RCM) App – Inspired by GE Meridium
🔹 Computerize Maintenance Management System (CMMS)
Developed CMMS using Google Sheets & Apps Script for automated maintenance tracking,
target achieved with ≥ 95% equipment availability, O&M cost reduce by 25 %.
https://www.linkedin.com/in/mohammed-merghani-pmi-pmp-smrp-cmrp-47b18817a/