Summary
Overview
Work History
Education
Skills
Languages
Affiliations
Timeline
Generic
Mohammad Ashraf

Mohammad Ashraf

Aligarh,India

Summary

A Civil Engineering Graduate with almost 24 years of comprehensive experience in Project Management and Construction Supervision of large Infrastructure Development Projects involving Roads/Highway and Structure Construction and Corridor Maintenance. Core competence in multidimensional execution of project along with optimizing resources utilization and effective site management. Strategic planner with expertise in planning, executing and spearheading construction Projects involving Method Engineering, Quantity Surveying and Contract Administration with flair for adopting modern construction methodologies in compliance to relevant Quality standards. Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in co-ordination with clients, consultants and ensuring on time deliverables.

Overview

26
26
years of professional experience
7
7
years of post-secondary education

Work History

Project Manager

Sarooj Construction Company LLC
Muscat, Sultante of Oman
10.2023 - Current
  • Construction of Harweeb-Mitan Asphalt Road in Governate of Dhofar

the required scope of works comprises to complete the construction of Harweeb-Mitan asphalt road with Approx. total length (211) km. in Governorate of Dhofar Due to V.O.1.

The project site is located in the border area of the Wilayat al Mazyounah at Dhofar Governorate

The project road start at Harweeb town directed to the north side and passing Andaat town at station about (44+780) Km and directed to north side passing Tusnat town at station about (70+020) Km and directed to north side reach to Mazyounah City at station about (108+950) and start from Mazyounah R/A at station. (120+000) leads to north direction up to Mitan town at station about (209+750) Km. In addition, Andaat- Habroot Link asphalt road with Approx. length (11Km).

The project consists of four stretches in addition Andaat- Habroot Link Road as per follow and showing in the Drawings.

· Stretche-1: (Harweeb - Andaat) with approximate length 45 km.

· Stretche-2: (Andaat - Tusnat) with approximate length 26 km. and Andaat- Habroot Link with approximate length (11km).

· Stretche-3: (Tusnat - Mazyounah) with approximate length 39 km.

· Stretche-4: (Mazyounah - Mitan) with approximate length 90 km.

The Road shall be Asphalted single carriageway with cross section consists of two traffic lanes with total C/W width (7.0) m with (05) m asphalt shoulders and (1.0) m earth verge in addition to (1.0) m rounding either side as per typical cross section at the drawing of the project.

The pavement layers thickness are as follows:

60 mm. Asphalt base course. 150 mm. Crushed Aggregate Base Course, 200 mm. Sub-Base layer,200 mm. Sub-grade.

The road will be provided with safety measures such as road marking, road signs, surface water drainage steel guardrail, concrete safety barrier, side slope protection, slope stabilization, and provision of future ducts and curb stone at junctions and also the works shall be including water drainage structures such as box culverts, pipe culverts & floodway at wadis locations.




Project Manager

Oman Gulf Company S.A.O.C.
Salalah, Sultanate of Oman
08.2023 - 09.2023

Work as a Project Manager Execution of related all road activity like Earthwork, rock cutting, Sub base, Asphalt, Multicell Pipes & Box Culverts, Curb, Road Marking Road Signs.

Construction manager

Anwar Fahud Projects LLC
Nizwa, Ad Dakhiliyah
10.2021 - 07.2022
  • Facilitated efficient communication among team members to resolve conflicts.
  • Coordinated with local authorities for necessary permits and approvals.
  • Prepared comprehensive project documentation adhering to industry standards.
  • Supervised workforce maintaining high levels of productivity on-site.
  • Maintained record of equipment inventory for monitoring usage and repair needs.
  • Coordinated construction projects from planning stage to completion.
  • Planned work schedules, ensuring tasks were completed within timelines.
  • Conducted regular site inspections for quality assurance.
  • Managed site operations ensuring adherence to safety regulations.
  • Developed contingency plans, minimising disruption during unforeseen events.
  • Streamlined workflow through strategic resource allocation.
  • The project undertakes pavement rehabilitation, road widening, and culvert replacement/extension and wadi bed cleaning earthworks from 0+000 to 19 +

710 (length-19.7 km). The scope also includes widening of the existing cross section from 8 to 11 m

Key Deliverables

 Pavement rehabilitation with conventional methods

 widening of the existing cross section from 8 to 11 m

 Culvert replacement & extension

 Floodway extension

 Earthwork for wadi bed cleaning

 Existing junctions to be improved

 Road marking and signage as per proposed design


Construction manager

Oman Gulf Company S.A.O.C. Salalah, Sultanate of O
Salalah, Sultanate of Oman
08.2013 - 10.2021
  • Construction and Modification work for
    Strengthening of the existing pipe Rack at port of Salalah (OGC CONTRACT NO-OGC/06/2019)

The project consisting the Temporary Traffic Diversion, Earthworks, Boulders Works, Rerouting of existing utilities including road diversions including Protection of New & existing live utilities including Fence and Gate, Cutting of existing road surface and removing asphalt layer, Removal of Barrier including lifting handling and placing ,Non- Shrink cement based grout Grouting ,Manual Excavation to remove loose soil 150mm thick in ordinary soil and disposal of surplus material as per the specifications, drawings and instructions, Preparation of existing column surface by chipping and removing existing waterproof layer ,Drilling 25mm x250mm deep holes on pedestal, Supply and installation of 20mm dia steel anchor bars & 30mm dia HILTI HIT RE 500 BOLTS (Gr. 8.8), laying Gauge 1000 polythene layer for the moisture, Reinforced Concrete Grade C40/50 using OPC for raft, Pedestal and sleepers, High yield strength deformed reinforcement bars cutting, bending, placing, testing etc. complete as per project specifications Bars of minimum yield strength 460 N/mm2, Concrete Protection Works( Nito Cote system, Deckgurard system and fixing glass mat),fixing foundation Anchor Bolts30 & 36 mm dia grade 8.8,Modification for existing road including crash barriers, Fabrication, Supply and Installation of Road signs / sign boards & road marking, Demolition/rerouting of Above/ Underground and Below ground utility/ services, Other Testing and Pre commissioning and Commissioning o Ancillary systems, Installation of Earthing Boss, And Substantial Completion: All pre-commissioning activities are completed and pre commissioning report submitted and accepted.

  • Early Civil Works - Salalah LPG Extraction Project: Sub-Contract No.JI- 2033/27-001, PETROFAC LLC, AND Client OMAN GAS COMPANY

The project consists of Early works like Cutting, Filling & Crushing of E&F and Storage Area & RCC Foundation of Butane & Propane Gas Tank, RCC Retaining wall, Concreting work, Construction of Asphalt Road all internal plant.
S.A.O.C., Governorate of Dhofar in Sultanate of Oman

  • Construction of Internal Asphalt Roads at Jarziz Farm in Salalah City Governorate of Dhofar in Sultanate of Oman

The project with consisting the activity like Storm sewer Line, earthwork, sub base, Asphalt, Curb Stone, Road marking & street Light works

  • Construction of Mosque at Thumrait with complete Centerized HVAC works including decoration by Gypsum & GRC Sultanate of Oman.

Construction of Mosque at Thumrait with RCC Foundation, Column & Beam 18.5 m high Dome with 16 m dia & 02 No’s Minarets of 35 m height with 02 No’s Modernized Ablution with Toilets units & having Centerized HVAC works including decoration by Gypsum & GRC Sultanate of Oman.

Site/Project Engineer

Oman Gulf Company S.A.O.C. Salalah, Sultanate of O
Salalah, Dhofar
04.2006 - 06.2009
  • Construction of Primary & Secondary Dual Carriageway of the Duqm Master plan `roads in Sultanate of Oman

Execution of related all road activity like Earthwork cutting & Filling, as well as rock cutting by blasting & Filling, Sub base, base course, Asphalt, Multicell Box Culvert & Pipe, Shotcrete works.

  • Design & Construction of Internal Asphalt Roads at Wilayat Al-Mazyunah in Sultanate of Oman

Execution of related all road activity like Earthwork, rock cutting, Sub base, base course, Asphalt, Multicell Pipes & Box Culverts, Curb, Road Marking Road Signs.

  • Construction of F-16 Facilities at Thumrait Air base

Construction of Runway, with Earthwork, Sub base, aggregate base course, bituminous base course, Wearing Course & Road Marking.

Assistant Engineer Roads & Highway

M/s Punj Lloyd Limited. (Jaipur & Guwahati) India
Jaipur Rajasthan & Assam Guwahati , India
04.2003 - 04.2006
  • Widening and Strengthening of Existing National Highway from 2 lanes to 4 lanes from Km 1065.00 to 1093.00 of Guwahati to Nalbari Section of National Highway (NH)-31 in Assam on East-west Corridor under Phase II.

Execution of road works including, Embankment, Sub-Grade, GSB, WMM, Construction of site office & Camp, Coordination with Supervision Consultant, Client and Sub Contractors. Preparation of Sub Contractor Bills & progress Review

  • Construction of an Access controlled 4-lane divided Carriage way with 6-lane Structures of Jaipur Bye Pass, Phase II. Zone ‘D’, 34.7 Km. long, Connecting Km. 220 of NH-8 (Delhi-Jaipur Road) at Chandwaji and Km. 246 of National Highway (NH)- 11(Jaipur- Sikar Road) at Harmara

Construction of Grade separator, multi cell box culvert, RC Pipe up to 1200 mm dia. Camel Crossing, Underpasses high embankment fill confined with RE Panel , Sub-Grade, GSB, WMM, Construction of site office & Camp, Coordination with Supervision Consultant, Client and Sub Contractors, Preparation of Sub Contractor Bills & progress Review.




Site Engineer (Roads)

M/s Narendra Builders, Aligarh, UP India
Gautambudh Nagar, India
09.2002 - 04.2003
  • Construction of PMGSY road under PWD, Gautam Budhnagar Package-I (UP)

Execution of road works & II, Premix Carpeting, prime Coat & tack Coat, Pipe Culvert like 1000 mm, 600 mm, and 350 mm diameter. Using NP-3 Grade Pipe, Making of bills with client

Site Engineer

M/s. Vashisthe Builders & Engineer Pvt. Ltd. (Ghaz
Ghaziabad, India
06.1999 - 09.2002
  • Worked in a World Bank project, under UP-DASP (W) Meerut as per MOST Specification at package No. ALG-10, 11 & 21

Execution of Embankment, Sub-grade, WBM – Grade I, II & III, Prime Coat & Tack Coat, Premix carpeting & 20mm thick MSS. Calculation of quantity of earthwork, WBM, Base course & wearing course, Making of L-Section & Cross section. C – Standard proctor test, field density test by sand replacement method, atterberg limit gradation test. Aggregate impact value, water absorption test of bricks, compressive strength test of & binder content test of bitumen

Education

Bachelor of Technology - Civil Engineering

Rajasthan Vidyapeeth University
India
06.2009 - 06.2013

Diploma of Higher Education - Civil Engineering

Aligarh Muslim University
India
06.1996 - 04.1999

Skills


  • Advanced excel proficiency
  • MS project proficiency

Languages

English
Fluent
Hindi
Native
Arabic
Intermediate
Urdu
Native

Affiliations

  • Playing watch Cricket

Timeline

Project Manager

Sarooj Construction Company LLC
10.2023 - Current

Project Manager

Oman Gulf Company S.A.O.C.
08.2023 - 09.2023

Construction manager

Anwar Fahud Projects LLC
10.2021 - 07.2022

Construction manager

Oman Gulf Company S.A.O.C. Salalah, Sultanate of O
08.2013 - 10.2021

Bachelor of Technology - Civil Engineering

Rajasthan Vidyapeeth University
06.2009 - 06.2013

Site/Project Engineer

Oman Gulf Company S.A.O.C. Salalah, Sultanate of O
04.2006 - 06.2009

Assistant Engineer Roads & Highway

M/s Punj Lloyd Limited. (Jaipur & Guwahati) India
04.2003 - 04.2006

Site Engineer (Roads)

M/s Narendra Builders, Aligarh, UP India
09.2002 - 04.2003

Site Engineer

M/s. Vashisthe Builders & Engineer Pvt. Ltd. (Ghaz
06.1999 - 09.2002

Diploma of Higher Education - Civil Engineering

Aligarh Muslim University
06.1996 - 04.1999
Mohammad Ashraf