Primavera P6
A dynamic professional with 09 years of rich overseas and indigenous experience in handling large scale construction projects for Roads and Infrastructure, Railways, and Industrial Buildings. A keen and astute planner, strategist and implementer with demonstrated abilities in Project Planning and Monitoring. Rich experience in managing projects right from development to delivery encompassing planning, monitoring, controlling phases of project lifecycle. Proactively assessing progress, completion forecasts and providing solutions to mitigate schedule delays or to optimize project completion. Strategist in preparation of Cost Claim. Evaluating project progress against baseline schedules, KPI and raising the flag with Management to resolve critical issues. An effective leader with skills in coordinating with various hierarchies in the organization.
Client: Ministry of Heritage and Tourism, Sultanate of Oman
Project: Oman Botanic Gardens – Main Works @ Al Khoud, Muscat
Value: 312 Million USD
Responsibilities:
Part of project control team assigned to Oman Botanic Garden project, one of largest in world, designed for LEED Platinum certification, located over 430 hectares consist of two glass biomes, cable car, steel & façade structure, PV farm, water treatment plants, and landscape.
Planning and scheduling:
• Responsible for developing, monitoring and reporting of project plans, cost estimates and schedules.
• Implemented an automated data collection tool 'Procube' to update project progress which reduced manual effort and increased productivity over 20% resulting in significant savings.
• Proactive analysis of program and monitoring productivity, cash flow, resource histogram, progress curves for early warnings, bottlenecks and assessment of likely impacts of changes/variations and likely mitigation plan.
• Coordination with client, consultants, senior management and statutory authorities.
• Periodically reviewing progress of design, procurement and construction with reference to baseline program, addressing shortfalls, develop recovery schedules when and where required and ensuring plans made are implemented.
• Identified resources requirement for project and effective utilization of organizational and subcontractor resources.
• Preparation of weekly, monthly, executive reports and contractual correspondences.
Cost Control:
• Preparing project budget, coordinating with procurement team and advising procurement strategy to ensure that all packages executed within assigned budget.
• Identifying and maintaining records of contract vs tender variation, changes issued via Engineer’s Instruction and formalizing changes by submitting notice of claim and amendments.
• Preparing cost control reports and cash flow.
Subcontractor Management:
• Identifying and appointing of specialized subcontractors.
• Preparing contracts documents, negotiation with vendors and finalizing contract.
• Administering signing of contracts, conducting review meetings with subcontractors to monitoring progress of deliverables.
• Reviewed subcontractor interim invoice and claims.
Risk Management:
• Identified risk, maintained risks register and implementation of risk mitigation plan.
• Regularly monitoring critical path, maintaining accurate and comprehensive records of delay events and analyze delay events.
Client: Ministry of Transport and Communications, Sultanate of Oman
Project: Al Batinah Expressway Package-IV
Value: 354 Million USD
Responsibilities:
Part of planning team which was assigned to construct Al Batinah Expressway Package-IV which consisted of earthworks, excavation and fill, construction of two interchanges, seven overpasses across the expressway at different locations, five wadi bridges, approx. 189 single and multi-cell reinforced concrete box culverts, median drainage system, dykes and embankment protections, pavement construction courses, signage, road lighting and safety barriers.
Client: Ministry of Transport and Communications, Sultanate of Oman
Project: Al Batinah Expressway Package-IV
Value: 354 Million USD
Responsibilities:
In charge of Pre-cast, steel yard and responsible for ensuring casting of 1036 I–Girders, 1600 Culvert Segments, 16000 Sq. of MSE Panels, and 42000 Meters of Single face barriers by estimating 50,000 MT of steel quantities for the project.
Client: Ministry of Transport and Communications, Sultanate of Oman
Project: Modification of existing Round About at Saham, Khabourah.
Value: 42 Million USD
Responsibilities:
Works were to modify existing roundabout at Saham and Khabourah with live traffic to U-turns, for which existing culverts and road works were to be widened.
Client: Punjab State Electricity Board
Project: Railway siding for Nabha Power Limited, Punjab
Value: 52 Million USD
Responsibilities:
Joined as Planning Engineer to monitor the progress of works for the development of railway siding of 14 km for delivery of coal to Nabha power plant.